Progress and Current Status 
 

~  ~  ~  ~

Thank you to PJ Hayes Inc. for site excavation and topsoil removal for this project! They provided these In-Kind Services to show their support for this project...

~  ~  ~  ~

BIG THANK YOU TO:
Hamilton Crane Service Ben Hamilton donated all the labor and heavy equipment to take down the trees and clear them away for the project.

~  ~  ~  ~

Thank You to Pat's Contracting of Walpole... They donated all the labor for taking down the old bleachers and also the attractive wall that will ring the new field.

 

 

 


Original Turco Field Marker

 

 

  Fall 2007

  October 11th 2007:

Teams cutting and sewing the field lines Goalie Box sideline and top arc are prepped...note Asphalt work in background. The BIG W is in and they are putting in the soccer center circle
Long Jump Pits filled with sand Attractive coated fence Closeup of lines and marker insert...note gravel under field
Looking Left... Center... Right
]
Goal Line and Center mark 4 Sports, 4 colors 50 Yd Line
 
The BIG W Closeup of field detail

  October 9th 2007:

THE BIG W! White bags are the rubber filler Plenty of sideline room. Soccer field is yellow.
Hill should be green any day now with the recent rain. Control box for future lights The field is crowned in the middle to assist in drainage

  October 8th 2007:

View looking south White bags are the rubber filler Track bed laid down
 
Each yard line is sewn into the field mat The BIG W is waiting to be sewn in at half-field

  October 6th 2007:

West End Zone 20 yd line Midfield
Edging being laid down East End Zone From the top of the new stands

  October 2nd 2007:

Each strip is 5 yards wide and over 60 yards long Starting at the West end The Benches and Track will be in the foreground
10 and 20 yd lines 50 yd line Each roll is over 300 pounds and has to be placed to within 1/8 inch

  Late September 2007:

Mid September Status HS is to the right, temp football field is below Copter View...all topsoil removed
 Track surfacing complete, lines coming Project Phase I is 95% done Grading trucks finish surface prep for field fabric placement soon

  Summer 2007

Final track leveling Final field and track bed done West track turn and new wall
  Long Jump Pits North wall and far straightaway
Electrical for pumps and future lights New wall, Lax field is up the hill to the left  
Tree Removal equipment arrives Clearing the hill  
Field is lined for topsoil removal    
The hill will be cleared for more viewing room. The LAX storage shed is seen on the hill. Field Prep begins!
2 feet of topsoil is removed to make way for the piping and field    
3 layers of sand and gravel will allow for drainage Barrier of field will keep surface in place and rainwater contained Brand new brick wall with erosion-proof anchoring
 
Field edge (R) abuts track (L) with a smooth seam Field underlayer almost done  

  Spring 2007 (Work begins...)

Soil testing Last view of old bleachers Construction safety fence installed
     
Thank You to Pat's Contracting of Walpole... They donated all the labor for taking down the old bleachers and also the attractive wall that will ring the new field.

  Fall & Winter 2006 (Design and pre-construction planning)

Arial view of old Turco Field Downtown Sign Old Track

This view from the top of the bleachers shows how bad the field is...

Vines cover the backstop and the track can't be used. Field is dirt surrounded by weeds ...more dirt.
Snack Shack   Near the baseball field entrance.
 
High School behind left, Plympton building behind right Looking west  

 

 

   
 

 